欢迎访问济南恒安净化工程网站,为您提供层流手术室净化,GMP车间净化公司,山东无尘车间的相关信息。
咨询热线:18653160053
新闻资讯 news

产品推荐

层流手术室净化生物安全柜

层流手术室净化生物安全柜

GMP车间净化传递窗

GMP车间净化传递窗

山东无尘车间FFU

山东无尘车间FFU

热门文章

线夹的类型及作用

连接器的机械性能及电气性能简要介绍

阀体的材质及主要作用是什么

模具选材需要满足的条件和原则有哪些

空气净化设备如何挑选?

如何创建更好的食品净化工程

联系我们 CONTACT

地址:济南市槐荫区美里路丽水华庭

电话:18653160053

QQ:850206910

新闻资讯 您当前的位置:首页 - 新闻资讯 >

手术室净化建设的几个阶段!

来源:http://www.henganjh.cn │ 发表时间:2019-11-19 

  净化施工过程是我们应该学习的,并不是一个简单的事情,所以手术室净化是我们应该知道,我们都知道,一切都是必要的建设、手术室净化也不例外,因此,今天,我们想知道手术室净化建设几个阶段。
  Purification construction process is something we should learn, not a simple thing, so purification in operating room is something we should know, we all know, everything is necessary construction, purification in operating room is no exception, so today, we want to know several stages of purification construction in operating room.
  1. 对图纸和技术资料进行仔细的联合审查
  1. Carefully joint review of drawings and technical data
  充分了解设计意图,做好图纸审核和技术交底工作是保证洁净室施工质量的重要技术环节,发现并解决施工中遇到的技术难题,为保证洁净室的施工质量奠定坚实的基础。
  Fully understand the design intent, do a good job in drawing review and technical disclosure is an important technical link to ensure the construction quality of the clean room, find and solve the technical problems encountered in the construction, and lay a solid foundation for ensuring the construction quality of the clean room.
  施工过程中会出现各种矛盾,需要施工方配合设计施工方在保证洁净室施工质量的前提下进行合理变更。
  There will be various contradictions in the construction process, which requires the construction party to cooperate with the design and construction party to make reasonable changes on the premise of ensuring the construction quality of the clean room.
  如在洁净室改造工程检查发现导管大小在身体的原始设计建筑楼层高度限制在吊顶层无法施工,施工后的配合设计人员和项目所有者在不影响工程质量的前提下,管道的大小从广场到部门,满足风量的需求,确保建设的天花板高度的要求。
  For example, it is found in the inspection of the clean room reconstruction project that the duct size is limited in the height of the original design building floor of the body and cannot be constructed in the ceiling layer. After the construction, the cooperation designer and the project owner, on the premise of not affecting the quality of the project, can meet the demand of the air volume from the square to the Department and ensure the ceiling height of the construction.
手术室净化建设的几个阶段
  2. 严格控制材料和设备的质量
  2. Strictly control the quality of materials and equipment
  洁净室的材料设备主要有各种装饰材料和空调设备材料。装饰材料应严格按照国家有关工程技术标准、施工质量验收规范和设计文件的要求进行检验和验证。洁净室应采用不产生粉尘、不集尘、耐腐蚀、防潮、防霉、易清洁、有防火功能的材料。木材、石膏板不得作为表面装饰材料。
  The materials and equipment of the clean room mainly include various decoration materials and air conditioning equipment materials. Decoration materials shall be inspected and verified in strict accordance with relevant national engineering technical standards, construction quality acceptance specifications and design documents. Clean rooms shall be made of materials that do not produce dust, do not collect dust, are corrosion-resistant, moisture-proof, mildew proof, easy to clean and have fire-proof functions. Wood and gypsum board shall not be used as surface decoration materials.
  手术室净化过程的阶段是我们应该掌握的,所以净化阶段是我们在生活中应该注意的,这些知识实际上会增加我们的知识储备,以上的手术室净化建设由我们几个阶段来进行。
  We should master the stage of the purification process of the operating room, so we should pay attention to the purification stage in our life. These knowledge will actually increase our knowledge reserve. The above purification construction of the operating room is carried out by us in several stages.

上一篇:洁净层流手术室净化需要掌握的基本操作原理
下一篇:无尘车间设计需要哪些步骤?